Water Supply Line Construction

Water Supply Line Construction

Why you will prefer PDL Water Supply line construction service?

·         In house Survey, design & Implementation team.

·         Yearly capacity 180 KM.

·         Equipped with 4 no. Horizontal direction drilling machine (HDD) 2 nos. Bursting & other related machine-like GPR Machine, Tracking machine, Jointing & pressure test machine.

·         Trenchless method pipe laying 15 mm to 600 mm diameter.

·         Open trench method pipe laying 15 mm to 1000 mm diameter.

·         Team with 30 Engineers & 170 technical staffs.