Deep Tube Well Construction

  • Site clearance and digging of drilling pit/vat cutting
  • Set the vertical drilling rig
  • Continuous drilling operation up to the bottom of the target depth
  • Sediment sample collection, sieve analysis, Geophysical logging
  • Fixture installation
  • Gravel packing
  • Well development
  • Development by compressed air
  • Washing dispersant and chlorination
  • Development by high velocity water jetting
  • Pump testing
  • Disinfection
  • Clean up
  • Well head installation
  • Connection of delivery line to the network