Deep Tube Well Construction

  • Experienced in working with 4-18 inch Big Diameter Deep Tube well Work
  • In house experience design & implantation team.
  • Equipped with 5 nos. automatic truck mountain & 4 nos. semi-automatic drilling machine & others related support equipment.
  • Use of quality pipe, submersible pump and fittings.
  • More than 200 Deep Tube Well (DTW) for DWASA.
  • More than 200 Deep Tube Well in Private Sector.
  • Experienced in highest depth (501 meter) of DTW drilling & installation with PVC pipe in Banani under DWASA-WOP.
  • More than 50 Deep Tube Well under department of public health engineering in different municipality of Bangladesh.
  • Completed different area ground water study /investigation with institute of water modeling.
  • Team with 15 Engineers 3 Hydro-Geologist & 150 technical staffs.